The entire project includes the construction of the road network, the sewage network, the construction of the rainwater sewerage system and the street lighting system. The total width of the “Gjon Buzuku” street is 16 m, with 2 lanes of 3.5 m each, 2 m parking, 1.5 m bicycle lane and 2.5 m sidewalk in the West orientation, 3 m sidewalk from the East orientation. The road body will be covered with asphalt-concrete, the sidewalks are paved with black basalt stone, while the bicycle lane is built with a red concrete layer. The mosque square is paved entirely with black basalt stone.

Name: Reconstruction of “Gjon Buzuku” street, polyclinic square, mosque square, bazaar square, “Mborje” street, “Ravonikut” street, Korçë

 

Location: Korce

Length: 3km

Client: FONDI SHQIPTAR I ZHVILLIMIT

Current Status: Finished

Year: 2015

 

Projectors “InfraKonsult” sh.p.k & “Dea Studio” sh.p.k