{"id":2159,"date":"2022-02-06T21:54:23","date_gmt":"2022-02-06T21:54:23","guid":{"rendered":"https:\/\/infrakonsult.al\/?p=2159"},"modified":"2025-04-28T10:25:09","modified_gmt":"2025-04-28T10:25:09","slug":"tunele-koman","status":"publish","type":"post","link":"https:\/\/infrakonsult.al\/en\/tunele-koman\/","title":{"rendered":"Supervision of works for the rehabilitation of tunnels and auxiliary galleries (access) of the Koman HPP dam"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"2159\" class=\"elementor elementor-2159\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-511f4d7 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"511f4d7\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2fa89c1\" data-id=\"2fa89c1\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-08785f8 elementor-widget elementor-widget-text-editor\" data-id=\"08785f8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>\"Supervision of works for the rehabilitation of tunnels and auxiliary galleries (access) of the Koman HEC dam\"<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0d0d836 elementor-widget elementor-widget-text-editor\" data-id=\"0d0d836\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The facilities for which full rehabilitation is required are part of the Koman hydroelectric power plant works, mainly the discharge works and the intake works.<br \/>The supervision group has monitored and controlled the rehabilitation works as follows:<br \/>a) The connecting tunnel of the intake work with the main transport tunnel on the right shoulder of the Koman dam.<br \/>b) Connecting tunnel of the control room of the discharge tunnel no. 4 (working gate), with the main transport tunnel on the right shoulder of the Koman dam.<br \/>c) Connecting tunnel of the tower of the discharge gate no. 3 (repair gate) on the left shoulder of the Koman dam.<br \/>d) Connecting tunnel of the control room of the discharge tunnel No. 3 (working gate) on the left shoulder of the Koman dam.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e366d3f elementor-widget elementor-widget-text-editor\" data-id=\"e366d3f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: #000000;\"><strong>Location:<\/strong><\/span>\u00a0Koman<br \/><span style=\"color: #000000;\"><strong>Length:<\/strong><\/span>\u00a0603 m<br \/><strong><span style=\"color: #000000;\">Client:<\/span><\/strong>\u00a0Albanian Electric Power Corporation <br \/><span style=\"color: #000000;\"><strong>Current Status:<\/strong><\/span>\u00a0in continuation<br \/><span style=\"color: #000000;\"><strong>Year:<\/strong><\/span>\u00a02021<br \/><span style=\"color: #000000;\"><strong>Supervisor:<\/strong><\/span>\u00a0InfraKonsult shpk,Angerba shpk, Palma Construction shpk<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>\u201cMbikqyrja e punimeve per rehabilitimin e tuneleve dhe galerive ndihmese(aksesit) te diges HEC Koman\u201d Objektet p\u00ebr t\u00eb cilat k\u00ebrkohet rehabilitimi i plot\u00eb i tyre, jan\u00eb pjes\u00eb e veprave t\u00eb hidro\u00e7entralit t\u00eb Komanit dhe kryesisht t\u00eb veprave t\u00eb shkarkimit dhe t\u00eb vepr\u00ebs s\u00eb marrjes. Grupi i supervizionit ka ndjekur dhe kontrolluar punimet e rehabilitimit si me<\/p>","protected":false},"author":1,"featured_media":2160,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[79],"tags":[],"class_list":["post-2159","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-supervizione-sq"],"acf":{"dl_description":"","dl_pinterest_image":"","dl_hashtags":""},"_links":{"self":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/2159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/comments?post=2159"}],"version-history":[{"count":5,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/2159\/revisions"}],"predecessor-version":[{"id":3073,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/2159\/revisions\/3073"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/media\/2160"}],"wp:attachment":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/media?parent=2159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/categories?post=2159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/tags?post=2159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}