{"id":2118,"date":"2022-02-06T21:10:48","date_gmt":"2022-02-06T21:10:48","guid":{"rendered":"https:\/\/infrakonsult.al\/?p=2118"},"modified":"2025-04-21T14:53:13","modified_gmt":"2025-04-21T14:53:13","slug":"stabilizimi-i-rreshqitjeve-ne-segmentin-rrugor-milot-rreshen-rruga-e-vjeter","status":"publish","type":"post","link":"https:\/\/infrakonsult.al\/en\/stabilizimi-i-rreshqitjeve-ne-segmentin-rrugor-milot-rreshen-rruga-e-vjeter\/","title":{"rendered":"Stabilization of landslides on the Milot-Rreshen road segment, the old road"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"2118\" class=\"elementor elementor-2118\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-69d10d19 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"69d10d19\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2f094d6e\" data-id=\"2f094d6e\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-1df659cd elementor-widget elementor-widget-text-editor\" data-id=\"1df659cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\n<p>This contract consists on the stabilization of four landslides located on the right side of the Milot-Rreshen national road. Landslide No. 1 is located on the right side of the road, about 10.18 km before the town of Rubik. Landslide No. 2 is located on the right side of the road, about 9.92 km before the town of Rubik. Landslide No. 3 is located on the right side of the road, about 8.23 \u200b\u200bkm before the town of Rubik. Landslide No. 4 is located on the right side of the road, about 7.32 km before the town of Rubik. To stabilize the landslides, massive concrete walls should be built, recommending that their foundation be placed in the base formation.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-56bbe76 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"56bbe76\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-75cf5e5\" data-id=\"75cf5e5\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-f9b4c97 elementor-widget elementor-widget-text-editor\" data-id=\"f9b4c97\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Name:\u00a0<\/strong>\"Stabilization of landslides on the Milot-Rreshen road segment, the old road\"<\/p>\n<p><strong>Location:<\/strong>\u00a0Milot-Rreshen<\/p>\n<p><strong>Length:<\/strong>\u00a0324 m<\/p>\n<p><strong>Client:<\/strong>\u00a0Albanian Road Authority<\/p>\n<p><strong>Current Status:\u00a0<\/strong>Finished<\/p>\n<p><strong>Year:<\/strong>\u00a02020-21<\/p>\n<p><strong>Designers: \" <\/strong>InfraKonsult \u201d sh.p.k<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-4e1ea44 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"4e1ea44\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2b14124\" data-id=\"2b14124\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Kjo kontrote konsiston ne stabilizimin e kater rreshqitjeve te ndodhura ne anen e djathte te rruges nacionale Milot-Rreshen. Rreshqitja Nr-1 ndodhet ne anen e djathte te rruges, rreth 10.18 km perpara qytetit te Rubikut. Rreshqitja Nr-2 ndodhet ne anen e djathte te rruges, rreth 9.92 km perpara qytetit te Rubikut.Rreshqitja Nr-3 ndodhet ne anen e<\/p>","protected":false},"author":1,"featured_media":2119,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[85,75],"tags":[],"class_list":["post-2118","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projektim-rruge-dhe-sheshe-sq","category-projektime-sq"],"acf":{"dl_description":"","dl_pinterest_image":"","dl_hashtags":""},"_links":{"self":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/2118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/comments?post=2118"}],"version-history":[{"count":8,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/2118\/revisions"}],"predecessor-version":[{"id":3067,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/2118\/revisions\/3067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/media\/2119"}],"wp:attachment":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/media?parent=2118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/categories?post=2118"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/tags?post=2118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}