{"id":1967,"date":"2022-02-06T20:33:05","date_gmt":"2022-02-06T20:33:05","guid":{"rendered":"https:\/\/infrakonsult.al\/?p=1967"},"modified":"2025-04-21T14:56:42","modified_gmt":"2025-04-21T14:56:42","slug":"aeroporti-i-kuksit","status":"publish","type":"post","link":"https:\/\/infrakonsult.al\/en\/aeroporti-i-kuksit\/","title":{"rendered":"Kukes Airport"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"1967\" class=\"elementor elementor-1967\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-69d10d19 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"69d10d19\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2f094d6e\" data-id=\"2f094d6e\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-1df659cd elementor-widget elementor-widget-text-editor\" data-id=\"1df659cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\n<p>Parts of this project are:<\/p>\n<p>\u00a0<\/p>\n<ol>\n<li>Extension of the existing runway with a length of 300m, the cross section of which is 55m, of which 30m asphalt lanes, two asphalted shoulders with a width of 7.5m, and two unpaved shoulders with a width of 5m.<\/li>\n<li>The access road to the airport with a length of 139m and the design of the connecting junction with the Kukes-Peshkopi national road<\/li>\n<li>Project of three parking lots with a total area of \u200b\u200b8903 m<sup>2 <\/sup>as well as access roads to the parking lot<\/li>\n<li>Design of the square in front of the terminal with an area of \u200b\u200b3577 m<sup>2<\/sup><\/li>\n<li>Reconstruction of the existing apron and its extension, the surface area of \u200b\u200bwhich is 20100 m<sup>2<\/sup><\/li>\n<li>The perimeter road is 5572 m long, 3.5 m wide, and is paved with gravel.<\/li>\n<li>The road connecting the fire department building to the runway, with a length of 360m, a cross section of which is 9.5m, two asphalt lanes with a width of 3.75m and unpaved shoulders on both sides with a width of 0.75m.<\/li>\n<li>The service road is 460m long, the section of which is 8m, 6m of asphalt crossing lane, 1m of shoulder and 1m of ditch.<\/li>\n<li>Surface water drainage project which includes a length of 11km of concrete channels with different sections.<\/li>\n<li>Sewage sewerage project for all buildings inside the airport<\/li>\n<li>Architectural and structural design of the police building with a single-story reinforced concrete structure.<\/li>\n<li>Architectural and structural design of the meteorology building with a single-story reinforced concrete structure<\/li>\n<li>Architectural and structural design of the fire department building with a two-story reinforced concrete structure<\/li>\n<\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-56bbe76 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"56bbe76\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-75cf5e5\" data-id=\"75cf5e5\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-f9b4c97 elementor-widget elementor-widget-text-editor\" data-id=\"f9b4c97\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Name:<\/strong>Architectural and structural design of the fire department building with a two-story reinforced concrete structure<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Location:<\/strong>\u00a0Kukes<\/p>\n<p><strong>Surface:<\/strong>\u00a0584 000 m<sup>2<\/sup><\/p>\n<p><strong>Client:<\/strong>\u00a0Kukes Airport<\/p>\n<p><strong>Current Status:\u00a0<\/strong>Finished<\/p>\n<p><strong>Year:<\/strong>\u00a02019-2021<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Designers:\u00a0<\/strong>\u201cInfraKonsult\u201d sh.p.k<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-4e1ea44 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"4e1ea44\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2b14124\" data-id=\"2b14124\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Pjese e ketij projekti jane: &nbsp; Zgjatimi i pistes ekzistuese me gjatesi 300m, seksioni terthor i se ciles eshte 55m, nga te cilat 30m korsi asfaltike, dy bankina te asfaltuara me gjeresi 7.5m, dhe dy bankina te pasfaltuara me gjeresi 5m. Rruga e aksesit per ne aeroport me gjatesi 139m si dhe projektimi i nyjes<\/p>","protected":false},"author":1,"featured_media":1968,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[85,75],"tags":[],"class_list":["post-1967","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projektim-rruge-dhe-sheshe-sq","category-projektime-sq"],"acf":{"dl_description":"","dl_pinterest_image":null,"dl_hashtags":""},"_links":{"self":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/1967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/comments?post=1967"}],"version-history":[{"count":6,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/1967\/revisions"}],"predecessor-version":[{"id":3083,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/posts\/1967\/revisions\/3083"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/media\/1968"}],"wp:attachment":[{"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/media?parent=1967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/categories?post=1967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/infrakonsult.al\/en\/wp-json\/wp\/v2\/tags?post=1967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}