"Supervision of works for the rehabilitation of tunnels and auxiliary galleries (access) of the Koman HEC dam"

The facilities for which full rehabilitation is required are part of the Koman hydroelectric power plant works, mainly the discharge works and the intake works.
The supervision group has monitored and controlled the rehabilitation works as follows:
a) The connecting tunnel of the intake work with the main transport tunnel on the right shoulder of the Koman dam.
b) Connecting tunnel of the control room of the discharge tunnel no. 4 (working gate), with the main transport tunnel on the right shoulder of the Koman dam.
c) Connecting tunnel of the tower of the discharge gate no. 3 (repair gate) on the left shoulder of the Koman dam.
d) Connecting tunnel of the control room of the discharge tunnel No. 3 (working gate) on the left shoulder of the Koman dam.

Location: Koman
Length: 603 m
Client: Albanian Electric Power Corporation
Current Status: in continuation
Year: 2021
Supervisor: InfraKonsult shpk,Angerba shpk, Palma Construction shpk