Supervision for the facility "Reconstruction of "Gjon Buzuku" Street, Polyclinic Square, Mosque Square, Bazaar Square, "Mborje" Street, "Ravonikut" Street, Korçë"

Location: Korce
Length: 3km
Client: FONDI SHQIPTAR I ZHVILLIMIT
Current Status: Finished
Year: 2015
Supervisor: “InfraKonsult”sh.p.k & “Dea Studio” sh.p.k.

This contract includes the control of construction works for the construction of "Gjon Buzuku" streets, "Mborje and Ravonikut" streets, as well as the reconstruction of the alleys of the historical bazaar. Also, the control of the works of the sewage network and rainwater drainage, and the control of the lighting works have been carried out.

"Reconstruction of "Gjon Buzuku" Street"

Boulevard Extension &
Korca Mosque