Supervision for the facility: "Qeparo Promenade, Lot 2"
This contract includes the control of construction works for the construction of the promenade, the parking lot and its connecting road. Also, the control of the works of the sewage network and the control of the lighting works on the promenade have been carried out.
Location: Qeparo,Himare
Length: 1.3km
Client: Fondi Shqiptar I Zhvillimit
Current Status: Finished
Year: 2015
Supervisor: JV “InfraKonsult & Dea Studio sh.p.k.