The total length of the road is 16.5km. The road section is 8.5 meters, 2X3 m asphalt lanes, 2×0.75 unpaved shoulders. Along its length, the road has earthen channels and culverts that serve for the drainage of rainwater. In the 3 urban areas, for the removal of rainwater we have designed a system with ditches and HDPE pipes. Also in this project, the construction of two bridges is foreseen. The first bridge with a length of 40.5m, with two light spans, as well as a bridge with a length of 637.5m with 18 light spans.

Name: Drafting of the construction project for the road section "Peshkepia - Entrance to the City of Selenica"

 

Location: SELENICE

Length: 17.058 Km

Client: ALMUHANDIS NIZAR AL-KURDI AL-MILLI ENGINEERING CONSULTANTS CO

Current Status: Finished

Year: 2021

Designers: “InfraKonsult” sh.p.k