The road segment for which the audit report was made is part of the total reconstruction project of the Fier-Seman road. The road safety project foresees interventions in 1.5km of the total length of 17km of the initial project. The road body consists of two 3m wide traffic lanes, with sidewalks on both sides of at least 1.5m wide and a 2.5m bicycle lane. The project also includes two bus stations, as well as two parking lots in the Dermenas unit area.
Name: "Consultancy service for the identification and supervision of road safety interventions and road inspections",
"Pilot project of the Fier-Seman road area with the highest road safety standards".
Location: Seman
Length: 1.5 Km
Client: Albanian Development Fund
Current Status: Finished
Year: 2019-2021
Designers: “InfraKonsult” shpk & Fred Engineering”