Repair of the Darragjat embankment, Shkodër
Coastal protection will be achieved by filling with brownstones.
The slope on the river side should be protected with a 10 cm thick concrete screen supported on a 0.2×0.3 m foundation. The concrete screen should extend 20 cm above the 8 cm thick embankment crown.
We have carried out all the necessary inspections for the successful implementation of all construction processes included in this contract. The control of the works includes: control of the implementation of the layer works, rainwater drainage works, works for the lighting system.
Location: Shkoder
Surface:
Client: Ministry of Agriculture, Rural Development and Water Administration. Shkoder Drainage Board
Current Status: Finished
Year: 2014
Designers: “InfraKonsult” sh.p.k





