The former veterinary school building is out of use. Its reconstruction includes: intervention in the repair of damaged walls, reconstruction of the roof, demolition of existing plastering and their replacement with new plastering, floor and ceiling works, doors, windows. Also foreseen are the installation of the hydrosanitary, electrical system, external water sewerage, water supply, sewage sewerage as well as the reconstruction of the facades.