Supervision of works for: “Reconstruction of the sewerage network on Kavaja Street (from the former N.S.H.R.A.K.U. to the Lana River”
Location: Tirane
Length: 400 m
Client: Tirana Water Supply and Sewage Sh.a
Current Status: Finished
Year: 2017
Works Supervisor: InfraKonsult
The purpose of this contract is the control of the sewage works. The length of the line to be rehabilitated is about 400m. The pipes are HDPE SN8 Dj-315mm and the control manholes are every 20m.




