In this project-implementation, the internal road infrastructure of the tourist resort “Green Coast” has been designed, in accordance with all international norms for the design of road infrastructure. The total length of the roads that have been built is 3835m, the road section varies from 8m to 10.5m, asphalt lanes 5m, shallow ditches from 0.4m, as well as sidewalks on both sides with a minimum width of 0.9m. This project-implementation includes the design of the main and secondary roads of this tourist complex, the design of the sewage system for wastewater, the design of the rainwater sewage system, the design of the underground engineering networks, and the street lighting project.
Name: Green Coast Resort New Roads Project, Palase
Location: Palase, Himare
Length: 3835 m
Client: Green Coast Resort
Current Status: Finished
Year: 2017
Designers: InfraKonsult