The entire project includes the construction of road infrastructure, a stormwater drainage system and a street lighting system.
The road is divided into two lanes, which are separated by a 2m wide traffic divider.
The road is 375m long, with 2×3.5m asphalt lanes, 0.5m concrete curbs and 3m wide sidewalks.