The entire project includes the construction of road infrastructure, a stormwater drainage system and a street lighting system. The road is divided into two lanes, which are separated by a 2m wide traffic divider. The road is 375m long, with 2×3.5m asphalt lanes, 0.5m concrete curbs and 3m wide sidewalks.
Name:"Lushnje-Tirana Access Road Project"
Location: Lushnje
Surface: 375m
Client: Lushnje Municipality
Current Status: Finished
Year: 2014
Designers: “InfraKonsult” sh.p.k