Contract D includes the following road axes:
- Tepelene-Kakavije 82.9 km
- Levan-Tepelena 57.71 km
- Fier-Vlore 0.34 km
- Messini Well - Sarande 121.8km
- Levan-Vlore 24.61 km
- K/Shkozet-Plepa 8.3 km
- Kranese-Konispol Bridge 33 km
- Sarande (Gajdar Bridge)-K/Qafe 22km
The contract includes these main categories of works:
- Rehabilitation works for other than pavement elements (Rehabilitation works for all road works other than layers) which includes the following works:
- Construction and reconstruction of drainage systems, culverts, channels, ditches
- Landslide stabilization
- Bridge repair
- Retaining walls and their reconstruction
- Road signage project, simple and large intersections
- Urban areas project
- Rehabilitation works for pavement
Based on traffic data, FWD measurements, and layer depth tests, it is possible to calculate road layers.
Name: Implementation Project “Road Maintenance and Safety”, Contract D
Location: Albania
Length: 351 km
Client: “Salillari shpk & ELIKA ATEE” ltd
Current Status: In continuation
Year: 2017-2022
Designers: "InfraKonsult” sh.p.k