Contract A includes the following road axes:
- Tiranë – Hani i Hotit 77.88 km
- Shkodër -Kukës 138.41 km
- K/Hani i Hotit – Tamarë Lezhë – Shëngjin – 6 km
- Ura e Bunës – Muriqan 13.9 km
- Melgushë (K/Rr.Nr.1) – Mjedë 7.1 km
Contract B includes the following road axes:
- Tiranë – Hani i Hotit 51.55 km
- Tirane – Durres 32.5km
- Durres- Fier 34.2 km
- Milot-Skuraj-Peshkopi 117.9 km
- K/Rr.Nr.6 – Dogana Bllade 3.35 km
- Vorë-K/Rinas-F.Kruje 11.5km
- Rinas intersection – Rinas – Qafe Kashar 9km
- Maminas-Hamallaj-ShenPjeter 23. km
The contract includes these main categories of works:
- Rehabilitation works for other than pavement elements (Rehabilitation works for all road works other than layers) which includes the following works:
- Construction and reconstruction of drainage systems, culverts, channels, ditches
- Landslide stabilization
- Bridge repair
- Retaining walls and their reconstruction
- Road signage project, simple and large intersections
- Urban areas project
- Rehabilitation works for pavement
Based on traffic data, FWD measurements, and layer depth tests, it is possible to calculate road layers.
Name: Implementation Project “Road Maintenance and Safety”, Contract A, Contract B
Location: Albania
Length: 623 km
Client: “Geci” sh.p.k& “Biolap” ltd
Current Status: In continuation
Year: 2017-2022
Designers: "InfraKonsult” sh.p.k