The area studied is from the beginning of the “Vasil Shanto” block to the “Palace of Arrows”. The project itself is the integration of several renewable energy technologies into a single and jointly monitored system and aims to reduce CO2 in the atmosphere. The area studied has a length of 1180m.
Name: “Pilot project for the lighting system, parking, and electrical supply of cars “2 km Smart City”, Clean Energy Road”’’
Location: Tirane
Length: 1.18 km
Client: Energy Efficiency Agency
Current Status: Finished
Year: 2020
Projectors: “InfraKonsult” sh.p.k