Supervision for: “Cleaning of the Drac stream (first phase)”
The first phase of the project consists of emergency works that will be carried out over a length of 6751 ml from the mouth towards the source. The works consist of clearing the vegetation, excavation for the resection of the stream. This resection will be done through excavations and fillings calculated in advance. The works for cutting trees, the works for the excavation works have been carried out and controlled.