Location: Bahcallek,Shkoder
Length: 811 m
Client: AGRICULTURAL TECHNOLOGY TRANSFER CENTER, FUSHE-KRUJE
Current Status: Finished
Year: 2016
Supervision: “InfraKonsult” sh.p.k
The purpose of this project is to implement the protection against erosion of the left bank of the Drin River in the Bahçalek area. To implement the protection, massive stone protection has been implemented along the bank. To ensure the protection of the longitudinal slope, the construction of a battery of massive stone brushes at a distance of 45 m from each other is envisaged.
These dams have a length of 18m and are reinforced at the head with gabions in the form of bags filled with gravel with a diameter of 100-120mm.