Supervision of Works for: “Flood protection and erosion control of the riverbed in Drino Mashkullorë, Drino Palokastër, in the village of Shtepëz”, “Flood protection and erosion control of the Drino riverbed in the Gerhoti area, repair of the damaged embankment of the V-3-12 irrigation canal, flood protection of the food market and the Valara bridge, Gjirokastër”, “Flood protection and erosion control of the Shushicë riverbed in the Hora area, Kallarat – Vranisht”, “Flood protection and erosion control of the Drino riverbed in the Drino area, Suhë, Gjirokastër”
The supervisor of the construction works aims to control and monitor the progress of the entire construction work process in accordance with the project, the technical conditions of implementation, the technical specifications, as well as the destination of the facility, taking into account the time limit set for the completion of the works and the value of the contract.
Company: InfraKonsult
Investor: United Nations Development Programme (UNDP)
Year: 2015