The project implementation begins at the exit of the Tunnel at Uji i Ftohte Vlore and ends at the Marina in Orikum, with a total length of 10.7 km.

This implementation project foresees reconstruction interventions for the existing national road Vlore-Orikum as well as the construction of two bypasses before and after the village of Radhime.

Interventions on the existing road include the rehabilitation of road layers, the rehabilitation of the drainage system, the construction of works of art, retaining and retaining walls, and the improvement of road signage.

The First Bypass is planned to be built with a length of 1440 km, while the Second Bypass has a length of about 2,020 km, the width of the road body is 8.5 m, the asphalt width is 6.5 m with 1 m wide shoulders on both sides.

Name:Drafting of the Implementation and Estimate Project for the Rehabilitation of the Existing Uji i Ctohtë – Orikum Road and the Construction of Two By-passes

 

Location: Orikum, Vlore

Length: 10.7 km

Client: Albanian Development Fund

Current Status: Finished

Year: 2018

Designers: JV “InfraKonsult” sh.p.k & “Atelier 4” sh.p.k & Seed Consulting” sh.p.k